Written by Chris Smith · Illustrative case study
The situation
A small builder I'd worked with before rang from a job at a property in Maudsland. His skip had been picked up a day late, the next one wasn't coming for three days, and his trades were tripping over colorbond and steel sheds, timber garden sheds and carport frames and roofing.
Why the customer needed help
Their main worry wasn't the cost. It was not knowing what could legally go where, and not wanting to damage the house getting it all out. Both of those are part of the job for us.
What was at the property
By my count there were colorbond and steel sheds, timber garden sheds and carport frames and roofing, along with the usual loose odds and ends that build up around a job like this. It's typical of what we see from properties being sold.
Working in Maudsland
Maudsland is a growing area of acreage and new estate homes. Maudsland properties are often larger blocks with sheds, paddocks and lots of trees, so green waste, shed clear-outs and scrap metal are common jobs. Long driveways and gravel tracks are fine; we check gates, slopes and wet ground before backing in.
The initial assessment
I arrived at the property and the first thing I noticed was the access. Before I look at the pile, I walk the route it has to travel: doorways, steps, the driveway slope, overhead wires, where the truck can park. For this job I paced it out and worked out we'd need about two-thirds of the tipper.
How the job was planned
I gave them a fixed price there and then, based on volume, and explained what was included: dismantling of small structures, metal recycling of sheeting and frames and footprint clearance and sweep. They said yes on the spot, so we planned to load in one visit rather than two.
Preparation
We checked the weather, laid out the straps and blankets for anything worth saving, and agreed a hand signal for "stop" because the truck was right on the road.
Step 1
Step one was the bulky stuff. My offsider and I took the largest items out first, tilting them through the door frames rather than forcing them. With colorbond and steel sheds, timber garden sheds and carport frames and roofing in the mix, there was no point clearing small things while the big ones were still blocking the way.
Step 2
Step two was the heavy lifting. Anything over about forty kilos went on the trolley or got a two-person lift with straps. No hero stuff. A strained back on the first job of the day ruins the week.
Step 3
Step three was the final check. I went back through every room and corner with the customer, picked up the small stuff the big items had hidden, and swept up.
Removal, sorting and loading
On the truck, heavy and flat things go on the bottom, long things go along the sides, and anything fragile for donation rides at the front where there's less bounce. Recycling stays in its own section so it can come straight off at the transfer station.
From the truck it went to a licensed transfer station, where recyclables were dropped off separately, and anything usable went to a local op shop before the tip run.
Challenges we ran into
Nails and screws were sticking out of most of the timber, and some offcuts had been mixed with good materials the builder still needed.
How we handled them
We knocked over the nails as we went and asked the builder to mark anything he wanted kept with tape. Nothing good went to the tip.
Completion and final result
When the last load was strapped down, the space was empty and swept. The customer walked through with me, signed off, and paid the price we'd agreed at the start, not a dollar more.
What I learned
What stuck with me was how much of it could be reused. People expect garden Shed Removal & Demolition to mean everything goes to landfill. On this job, close to a third of it went somewhere useful.