Written by Chris Smith · Illustrative case study
The situation
A small builder I'd worked with before rang from a job at a property in Kirra. His skip had been picked up a day late, the next one wasn't coming for three days, and his trades were tripping over doors, windows and trim, packaging from new fittings and old cabinetry and benchtops.
Why the customer needed help
They'd tried doing it themselves the weekend before, got about a quarter of the way through and realised the rest needed a truck, two people and a plan. That's where renovation Waste Removal comes in.
What was at the property
By my count there were doors, windows and trim, packaging from new fittings and old cabinetry and benchtops, along with the usual loose odds and ends that build up around a job like this. It's typical of what we see from builders managing tight sites.
Working in Kirra
Kirra is a beachside neighbourhood of units and holiday rentals. Kirra has a mix of older family homes, units and holiday rentals, which means plenty of furniture swaps, end of lease loads and yard rubbish. Some streets are narrow and busy in holiday periods, so we bring the right size truck and time the job well.
The initial assessment
First look, it was bigger than described, which is normal. People size up their own clutter by memory, not by volume. I measured it roughly by truck-loads, checked for anything we can't take, like paint tins or gas bottles, and found two old cans tucked at the back that we left aside.
How the job was planned
I split the job into zones in my head: what could come straight out the front, what had to come through the house, and what would need two of us and a trolley. That way nobody was waiting on anybody.
Preparation
Before lifting anything, we moved the cars, opened every gate wide and propped the screen door. A clear route is half the job.
Step 1
Step one was the bulky stuff. My offsider and I took the largest items out first, tilting them through the door frames rather than forcing them. With doors, windows and trim, packaging from new fittings and old cabinetry and benchtops in the mix, there was no point clearing small things while the big ones were still blocking the way.
Step 2
Step two was the loose material. Bags, boxes and odds and ends went into the truck in layers, packed tight into the gaps around the furniture so we weren't carting air to the tip.
Step 3
Step three was loading the donation pile carefully, strapping it separately at the front of the tray so it would arrive at the charity in one piece.
Removal, sorting and loading
I'm fussy about the load. A well-packed truck means one trip instead of two, and that's the difference between a fair price and an inflated one. We netted the top before we drove off.
From the truck it went to a licensed transfer station, where recyclables were dropped off separately, and anything usable went to a local op shop before the tip run.
Challenges we ran into
Nails and screws were sticking out of most of the timber, and some offcuts had been mixed with good materials the builder still needed.
How we handled them
We knocked over the nails as we went and asked the builder to mark anything he wanted kept with tape. Nothing good went to the tip.
Completion and final result
When the last load was strapped down, the space was empty and swept. The customer walked through with me, signed off, and paid the price we'd agreed at the start, not a dollar more.
What I learned
It reinforced something I tell every new offsider: ask before you lift. Two minutes of questions at the start saves throwing out the one thing someone really wanted to keep.