Written by Chris Smith · Illustrative
The situation
I'm Chris Smith, and this is an illustrative job in Robina, not an account of a real customer. In this example, Tanya needs an old above-ground pool and tired outdoor gear removed late on a Saturday afternoon.
Why they needed help
The pool is no longer used, and loose steps make the surrounding area awkward to walk through. Tanya wants the bulky items gone, but the long frame rails, heavy filter and narrow side access make it more than a trailer run.
What was at the property
The load includes a drained pool's frame and liner, freestanding timber decking and steps, a pump, filter and hoses. There are also folded shade sails, a dismantled gazebo, outdoor chairs, loose old fence panels and damp boxes of pool gear.
The initial assessment
I check access, sharp edges and what is still attached. The pump is unplugged, with no fixed wiring to disturb. I confirm the loose fencing is redundant, not part of a barrier protecting another pool, then quote by truck volume before loading.
Planning the job
With Tanya's agreement, I plan the work around our own two-person crew and tipper truck, without subcontractors. We need room to lay out the frame, so furniture goes first. With dark clouds building, I also choose a safe stopping point.
Preparation
We park with a clear loading route and keep the driveway entrance open. Gloves, eye protection, socket tools, a drill, trolley, tubs and tie-downs come out. I check the pool is empty and keep Tanya away from the dismantling area.
Step 1
We carry the chairs and bundled shade fabric through the side gate, checking for loose screws and snagging corners. The gazebo is already in pieces; we bind its poles together rather than leave narrow lengths loose underfoot.
Step 2
At the pool, one of us supports each frame section while the other releases its fixings. We work around in short lengths, keeping hands clear of joints. The liner folds inward onto itself so trapped grit does not spill along the path.
Step 3
Next we undo the freestanding deck sections and steps, removing exposed screws as we go. We do not pull against the house or cut into attached structures. The disconnected pump and drained filter travel on the trolley, with hoses coiled.
The removal
Long rails and fence panels need two people through the gate, one watching each end. We carry small bundles rather than stack them above our sightline. At the truck, heavier pieces sit low and spread across the tray, not piled at the rear.
Sorting and loading
Sound chairs stay separate for charity, subject to acceptance. Rotten timber and the worn liner stay apart for landfill; nothing is tipped in as one mixed heap.
Challenges
Mid-job, the storm arrives with gusts and rain. A box lifted from beside the filter tears across its soggy base, dropping plastic fittings onto the paving. Other boxes start sagging too, while the loose liner catches the wind.
How we handled them
We stop carrying long metal pieces and secure the liner without climbing onto the load. Once conditions are safe, we transfer the wet boxes' contents into rigid tubs. I check for chemicals, liquid paint and gas bottles, which we cannot take.
Completion
Before leaving, we collect fallen fittings, screws and cardboard scraps, then sweep the access path. I walk Tanya around the cleared footprint and point out uneven ground left by the pool. We secure and cover the load before moving the truck.
The result
In this example, Tanya gets the bulky pool remains and unwanted outdoor items removed, not a finished landscaping job. Reusable goods go to charity, recyclables to licensed facilities and the remaining waste to landfill after sorting.
Lessons learned
My takeaway is to check outdoor boxes from underneath and bring tubs, even when everything looks packed. For a late-afternoon pool removal, weather decides the pace. I'd rather pause with a secure load than rush long rails through a storm.